Elevator Aesthetic Rehab (Wallpaper Installation)
Project : Elevator Interior Wallpaper Installation
Contractor : <insert name>
Surface Preparation : In-House
As we begin to ease down on pandemic restrictions to somehow go back to normalcy from the pandemic, Team TEL3 has undertaken the task of doing aesthetic rehabilitation of the interiors of our 2 elevators. We have likewise done away with all the plastic covering of elevator buttons.
The surface preparation has been done by our In-House Staff (PM Louie, James, Rolly, and Rogelio). White LED lights have been installed by Mel. Afterwards the wallpaper was installed by the contractor. Wallpaper design was carefully handpicked by Ms. Marides Silvestre.
PROJECT GALLERY :
~~~~~ SURFACE PREPARATION ( IN-HOUSE ) ~~~~~
Comments
Post a Comment